The closed staircase from Stevenage station's footbridge to the Leisure Park would be rebuilt in five weeks under a new application. Comments close 26 November.
The staircase linking Stevenage station’s footbridge to the Leisure Park is closed and unsafe, and its owner has applied to knock it down and build a new one. The application was registered with Stevenage Borough Council on Wednesday 4 November. The building work would take about five weeks.
The applicant is Legal & General Assurance (Pensions Management) Ltd, which owns the Leisure Park. Its agent, ABW Planning, says in a supporting statement that the staircase “is closed and is unsafe for continued public use”. The ramp beside it stays open as the step-free route.
Why the stairs were shut
The stairs are a steel frame carrying precast concrete flights and landings. Engineers have been reporting problems with them since 2023. The structural condition report filed with the application, by Simpson TWS and dated 23 July 2026, quotes the earlier findings:
- August 2023: the stair and ramps were “in a dilapidated and neglected state”, with rusting steel that was “in part severe”, cracking under the concrete treads and loose yellow nosings that were a slip and trip hazard.
- February 2024: a testing company, Moorhead Richardson, found the staircase “in a very poor condition” and said it “requires urgent attention”. The concrete was contaminated with chloride from de-icing salts and “likely beyond economical repair”. Some steel tread brackets were also probably beyond repair.
- July 2026: at a fresh inspection on 15 July, the engineers found the concrete treads and steel supports “had deteriorated further”. They advised that “serious consideration should be given to replacing key components of the stair, landings and supporting structure”.
The ramp was in better shape. The 2024 report said it could probably stay in use with repairs, and the July visit found it had not “deteriorated too much further”.
The application papers do not say when the staircase was closed.
What would replace them
The new staircase would sit on the same footprint, with the top and bottom in the same places. The application describes:
- a painted steel structure to match the existing station footbridge
- yellow handrails, balustrades and tread nosings, for contrast
- a narrower flight, so it meets current Building Regulations and Network Rail standards
- the ramp alongside and the vehicle route underneath both kept as they are
The width is the one real change, and the papers do not agree on it. The supporting statement says the clear width falls from about 2.72m to 1.8m. A transport statement by Connect Consultants, filed the same day, gives 1.97m and says the central handrail would go.
That transport statement is not finished. It says pedestrian counts would be taken after half term and away from bonfire weekend, minute by minute for four days, and the report updated once they are in. By Network Rail’s design formula, it says, a 1.97m staircase can carry 55 people a minute at its normal comfort level.
How long the work would take
A construction and demolition statement, dated 15 September, sets out a programme of five weeks, or 25 working days. Work would run from 8am to 5pm, Monday to Friday, in five phases: setting up the site, stripping out, demolition, building the new stairs and handover.
The site would be fenced with 2.4m hoarding, with a 10m exclusion zone and signed pedestrian diversions. Access for the contractor would be through the station car park. No contractor has been named yet, and the statement gives no start date.
What it means for you
Until a new staircase is built, people walking between the station and the Leisure Park, or on to the Arts and Leisure Centre, have the ramp beside the closed stairs. If you want to comment on the plans, you can do so on the council’s planning register under reference 26/00788/FP. The consultation period ends on Thursday 26 November, and the council’s target date for a decision is 30 December.
The council’s own estates team replied on 5 November that it had “no comments at this time”.